News

SECI Lists 60 MW Gaya Solar EPC Tender in Bihar

SECI lists an ISTS-connected 60 MW AC solar EPC and O&M tender in Gaya, Bihar, making site data, structure design and execution evidence immediate bid checks.

A tender listing is a procurement signal, not a supplier award or an Apex project.
A tender listing is a procurement signal, not a supplier award or an Apex project.

A live 60 MW solar EPC opportunity in Bihar

The Solar Energy Corporation of India (SECI) lists a tender for design, engineering, supply, construction, erection, testing, commissioning and O&M of an ISTS-connected 60 MW AC solar PV plant at Gaya, Bihar. The listing shows a 30 September 2026 publication date and a 12 November 2026 bid-submission date.

What the listing does and does not establish

This is a procurement notice, not a notice to proceed, equipment order or mounting-system award. The public listing does not identify Apex as a bidder, supplier or project participant. Bidders should use the complete tender documents and site information—not a listing alone—to establish the structural, civil, electrical and commercial basis.

Buyer impact for the mounting package

For a 60 MW AC field project, structure selection should be tied to the approved module envelope, layout, topography, geotechnical basis, design wind and other loads, corrosion environment, drainage, installation access and commissioning sequence. State foundation assumptions, pile tolerances, coating or corrosion system, packaging, inspection records and change-control process clearly in the bid plan. A generic bill of materials cannot replace a verified site and load basis.

Next step for EPC teams

Before pricing, reconcile the issued drawings and technical schedules with the construction method and procurement milestones. Apex utility-scale mounting solutions and a pile ground mounting system can be reviewed against the applicable project inputs; Apex is not represented as selected for this tender. Source: Solar Energy Corporation of India, tender listing SECI000284.

Related Apex pages

Continue with the product pages and resources that match this topic:

Prepare your project for Apex review

Send the project location, module datasheet, layout drawing, wind and snow basis, and roof or foundation condition for faster system selection.

Request Project Review